Great Western Electrification Project

June 14, 2018

RPS completes Independent Feeder designs for Royal Wootten Bassett to Thingley Junction.

 

Independent Feeders, which are separate from the OLE, are provided to supply Auto-Transformer Feeder Station (ATFS) locations, which are remote from the National Grid Bulk Supply Point (BSP) sites on the Great Western Electrification Project (GWEP).

 

Rail Power Solutions provided a sheath bonding strategy, narrating different options available in dealing with the cable conductive sheath earthing and bonding arrangement.  The detailed designs included dividing the cable sheath into a number of sections along the cable run by using sectionalising joints.  All designs were approved with minimal comments and the installation was free of any design issues.

 

 

 

Share on Facebook
Share on Twitter
Please reload

Featured Posts

The Great North Run

September 15, 2019

1/10
Please reload

Recent Posts

September 15, 2019

September 5, 2019

Please reload

Archive
Please reload

Search By Tags

I'm busy working on my blog posts. Watch this space!

Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2018 Rail Power Solutions. Created by Webit Design