top of page
690e48c3-53b8-46c5-bb1d-9a6104109048.JPG

Our Clients

At RPS, we believe great work starts with

great partnerships. We value the relationships

we have with our clients. 

 

We are proud to be working alongside some

of the biggest names in the industry.

Network Rail logo.jpg
Balfour_Beatty_Rail-1.jpg
Arup_Logo_Red_RGB.png
transport-for-london.png
bam.jpg
Kier.jpg
Octavius MAIN SOLID.jpg
224T-ENABLE-LOGO-RGB.jpg
unnamed-file.png
Cleshar.png
ALSTOM_2-COLOURS_4C_QUADRI_HD-1.jpg
Corporate-Members-Logos-45.jpg
sonic_rail_services_limited_logo.jpg
RAmboll.png
mgrouplogo.jpg
merseyrail-logo1.png
SWR Logo.png
download.png
kindpng_1055914.png
Strathclyde_Partnership_for_Transport_(logo).svg.png
3875600000175983320.png
1280px-Capita_logo_(2019).png
BakerHicks-Logo-opt.png
unnamed.png
images.png
ChatGPT Image Aug 11, 2026, 01_17_46 PM.png
images.jpg
Logo_Egis_Vert_Noir.png
AMCOGIFFEN.jpg
eyJrZXkiOiJsb2dvc1wvZW1wbG95ZXJzXC8xMDUwXC9rTTd4bE1kdFZiWjBURmtzYnhiSmhic0hmcG92NmRvYTg1QnJCeWt1LnBuZyIsImVkaXRzIjp7InJlc2l6ZSI6eyJ3aWR0aCI6MzAwLCJoZWlnaHQiOjE1MH0sInBuZyI6eyJxdWFsaXR5Ijo2MH19fQ.png
Tony Gee Logo Red.jpg
Spencer.png
download (1).png
AM1-Projects-23-jan-2013300.jpg
global-rail-construction.png
What customers say about us

"

Owen Evans
Infrastructure Manager
South Western Railway (formerly SSWT)

Rail Power Solutions Ltd has provided Stagecoach South West Trains (SSWT) with design services for DC electrification enhancements across their Depots at Clapham, Wimbledon, Farnham and Strawberry Hill.


The works have included, development of feasibility studies and redefining scopes prior to carrying out outline and detailed designs, all being supported by carefully structured site surveys and load assessments.


RPS's quality and attention to detail shown in their work has been of great benefit in obtaining NR and other stakeholder acceptances and in ensuring confidence during implementation. Delivery has always been timely, and revisions and alterations speedily accommodated.

We have no hesitation in recommending RPS and we look forward to continuing our excellent working relationship with them on future projects.

"

Nigel Plummer

Contractor’s Engineering Manager  Balfour Beatty Rail – Thameslink KO2

RPS are the preferred supplier to Balfour Beatty Rail for High Voltage design on the Thameslink Key Output 2 programme.

 

The programme has many key milestones dependant on High Voltage feeder diversions and modifications in order to complete the re-development of London Bridge Station and track remodelling works designed to facilitate the new high-frequency Thameslink services in 2018.

 

The work that RPS have undertaken for us to date has been of very high quality from the outset and the knowledge within the team at RPS is clear through the content and detail of the submissions.

I’ve also been impressed with RPS’s ability to work with us on defining the scope and obtaining the relevant information required to complete the submissions to the required standard.

  • Instagram
  • LinkedIn
  • Facebook
  • X

© 2026 Rail Power Solutions

risqs-stamp-combined-copy.webp
ChatGPT Image Aug 11, 2026, 10_05_19 AM.png
bottom of page