Fratton Depot Traction Power Upgrade
Rail Power Solutions (RPS) was responsible for delivering the multidisciplinary electrical design for the upgrade of Fratton Depot, encompassing High Voltage (HV), DC traction power and Electrical Track Equipment (ETE) requirements. The project required careful consideration of the existing depot infrastructure and operational constraints to provide an enhanced traction power arrangement while maintaining safe and effective railway operations. Through a coordinated multidisci


TfL Cockfosters Depot
RPS have been appointed to provide specialist DC Traction power design services, working with Arup and VolkerFitzpatrick to develop the detailed electrical design for the new maintenance facility building. The project forms part of the wider Piccadilly Line Upgrade programme and supports the introduction and maintenance of the new 24TS fleet, providing the electrical infrastructure required for the future operation of the upgraded Cockfosters Depot.


Charity Boxing
William took part in a White Collar Boxing event to raise money for Mind, a company providing support, advice and advocacy for people experiencing mental health challenges including depression, anxiety, and other mental health conditions. Will fought amazingly and won his match! Please check Will's page below to see the fundraiser.



