top of page

Fratton Depot Traction Power Upgrade

12 hours ago
1 min read

Rail Power Solutions (RPS) was responsible for delivering the multidisciplinary electrical design for the upgrade of Fratton Depot, encompassing High Voltage (HV), DC traction power and Electrical Track Equipment (ETE) requirements.

The project required careful consideration of the existing depot infrastructure and operational constraints to provide an enhanced traction power arrangement while maintaining safe and effective railway operations.

Through a coordinated multidisciplinary approach, RPS provided the engineering design necessary to support the depot's revised traction power requirements and associated infrastructure modifications


 
 
 

Comments


Recent Posts
  • Instagram
  • LinkedIn
  • Facebook
  • X

© 2026 Rail Power Solutions

risqs-stamp-combined-copy.webp
ChatGPT Image Aug 11, 2026, 10_05_19 AM.png
bottom of page