Fratton Depot Traction Power Upgrade
12 hours ago
1 min read
Rail Power Solutions (RPS) was responsible for delivering the multidisciplinary electrical design for the upgrade of Fratton Depot, encompassing High Voltage (HV), DC traction power and Electrical Track Equipment (ETE) requirements.
The project required careful consideration of the existing depot infrastructure and operational constraints to provide an enhanced traction power arrangement while maintaining safe and effective railway operations.
Through a coordinated multidisciplinary approach, RPS provided the engineering design necessary to support the depot's revised traction power requirements and associated infrastructure modifications














Comments