Project: 
CP4 and CP5 HV FeederRenewals

As part of five-year frameworks on behalf of Network Rail Infrastructure Projects to deliver electrification and plant upgrades and renewals in the southern region, Rail Power Solutions working as part of a multidisciplinary team for BCM and McNicholas, on Kent, Sussex and Wessex delivery areas, provided the electrical designs for 34No. 33Kv HV and Pilot cable feeder renewals.

These E&P upgrades and renewals, form part of Network Rail’s investment programme to enhance the rail infrastructure.

The RPS scope covers GRIP 1-8 reports and designs, consisting of –

  • Form A & B electrical

  • Pilot cable supervisory report for Mechanical and CROMOS based supervisory systems

  • Cable joint type requirements

  • HV cable end box modification design for various oil filled switchgear for new cable termination type – Pfisterer and Ansi type cable bushing

  • Hydraulic and Alarm studies.