DLR TPH Renewal - Bank and Beckton

Rail Power Solutions provided the design for the renewal of 2No. DC TP Huts for SRS on behalf of Docklands Light Railway at Bank and Becton.

​

The scope of work included –

​

  • Specification for supply of 2No. fully fitted DC modules complete with DC switchgear, Directional over current, Instantaneous overcurrent and Di/Dt protection, Frame leakage protection, Battery Charger, Marshalling Cabinet and domestic services;

  • Design of interface between the new DC modules and the existing DLR infrastructure, including integration with the existing SCADA RTU, Inter-tripping with adjacent substations and with Tunnel Trip protection system;

  • Development of new electronic Track Voltage Monitor Panels to provide real-time monitoring of running rail to earth potential with provision of SCADA alarms in accordance with EN50122 voltage limits;

  • Provision of a 750V DC protection study for track feed circuit breaker settings at Bank TPH, Royal Mint Street, Limehouse, Custom House, Beckton and Beckton Remote Substations;

  • Supervision of Factory Acceptance testing of DC modules, switchgear and track voltage monitor panels, inclusive of liaising with equipment suppliers.